Georgia Home Buyer's Inspection Reference logo — a house outline under a reading glassGeorgia Home Buyer's Inspection ReferenceInspections, tests and paperwork in a Georgia home purchase
Inside due diligence

Scheduling inspections inside the due diligence period: an order that leaves time to decide

The due diligence period does not pause for a busy engineer or a slow lab. A good schedule books the predictable work on day one and keeps the last days for decisions.

The short answer

Know the exact end of the due diligence period. On the first day, book the general home inspection, the wood infestation report and any specialist the house obviously needs, such as a septic evaluation, well test, sewer scope on an older house, or radon test. When the inspection report arrives, book findings-driven specialists the same day. Keep the final third of the period for estimates, decisions and negotiation of the repair amendment.

Day one

Confirm the end date and time with your agent. Book the general inspection for the earliest available slot and ask when the report will be delivered. Order the termite report. Book known specialists. Request records: the seller's disclosure statement, termite bond, roof and HVAC paperwork, county septic records, permits. Call an insurance agent for a quote, since roof age and condition and flood zone can affect coverage.

Inspection day

Attend if possible. Ask the inspector to show you the significant findings and to say which ones call for a specialist. Note any areas that were inaccessible: a locked room, a blocked crawlspace, a roof viewed from the ground. Ask the seller to make them accessible for a return visit if they matter.

Report day

Read the summary and then the whole report. Make three lists: items needing a specialist; items for the repair request; items you will handle after closing. Book specialists that day. If an engineer or contractor cannot come before the period ends, ask your agent about an amendment to change the period, and remember the seller does not have to agree.

The middle stretch

Collect specialist reports and written estimates. Ask the seller's side for any missing records. If a radon test is running, protect the test conditions. If a well bacteria test is positive, arrange disinfection and a retest.

The final days

Decide whether to proceed. Draft a short, specific repair request based on the findings that matter. Give the seller time to respond before the deadline. If agreement is not reached, decide whether to accept the house as it is or give notice of termination in the manner the contract requires, before the period ends.

How long a period to ask for

Long enough for the house. A newer house on public water and sewer needs less time than an older house on a septic system and well with a crawlspace. Agents and buyers negotiate the length with the seller at the offer stage, balancing time against competitiveness.

Common mistakes

Booking specialists only after reading the report when the need was obvious from the listing.

Leaving no time to negotiate.

Missing inaccessible areas. What was not seen was not inspected.

When a specialist cannot come in time

Sometimes a specialist's first opening falls after the deadline. The options are limited: find another qualified provider, ask the seller for an amendment extending the period, or decide whether to proceed without the evaluation. Make that decision early. A buyer who learns on the last day that the engineer cannot come has fewer choices than one who learned on the second day.

Keeping a record

Keep one document listing every inspection, who was called, when it was ordered, when it is scheduled, and when the report is due. Share it with the agent. The record makes missing items obvious and shows at a glance how much time remains for the amendment.

Where the facts come from

The Georgia REALTORS Purchase and Sale Agreement (F201) and its forms package; Rule 620-6-.03 on the termite report; the UGA Radon Program.

Frequently Asked Questions

What should I book first in due diligence?

The general home inspection, the termite report, and any specialist the house obviously needs.

How long should the due diligence period be?

Long enough to complete the inspections and estimates the house needs, and to negotiate.

What if a specialist cannot come before the deadline?

Ask about a written amendment to change the period. The seller does not have to agree.

Should I attend the inspection?

If you can. Seeing findings in person makes the report easier to use.

What if a specialist cannot come before the deadline?

Look for another provider, ask for a signed extension, or decide early whether to proceed without it.